Migrated around 600 VMs, 10 Hyper-V VMs,8 Workstations and 12 Physical servers using VMware Convertor Standalone tool.Set up the Virtual Infrastructure (5.1).Installed ESXi 5.1 hosts (45 hosts in both DCs).Set up VCEM and manage all enclosures using VCEM.Racking, Stacking, cabling of G7, G8 BL460c Blade servers.Involved in setting up the Global Data center where my activities involved.Involved in Due Diligence before providing a robust Virtualization Design solution based on VMware Virtualization.
Participated and contributed in the Gold Standard Audit for various projects managed by ConfidentialÄatacenter Consolidation / VMware Engineer.Constantly improve the services offered to customers based on their feedback and requirements.Provide Technical Support to Sales team to meet the sales targets.Escalate technical issues found during pre-sales DD to internal Stakeholders.Provide Business case Analysis to support Pricing proposals and Escalation.Analyzing potential partner relationships for the product Developing and implementing a company - wide go-to-market plan, working with all departments to execute.Driving a solution set across development teams (primarily Development/Engineering, and Marketing Communications) through market requirements, product contract, and positioning.Managing the entire product line life cycle from strategic planning to tactical activities.Validation of BOM for various projects in Confidential.
Providing Escalated Support to other projects in Confidential.Preparing Best Practices document for VMware Virtualization.AD users, groups creation and integrating with vCenter Server and NSX.
Documenting detailed procedure to implement complex and simple changes to CAB Meeting members.C7000 Server Profile configurations and troubleshooting issues related to profiles, Ethernet and Storage setup.Confidential SIM alert Monitoring and fixing issues related to Confidential SIM.Serve as a technical escalation point in support of high risk, complex operational challenges.Troubleshoot issues on VMs, ESXi hosts, vCenter Servers, NSX agent failure installation on ESXi hosts.Test and provide procedures to streamline best practices on ESXi hosts to Operations team.Installed and configured vROPS to monitor and analyze the risks of the Virtual Infrastructure 6.0 U2.Deployed and Integrated NSX with vCenter Server.Deployed 250+ ESXi hosts and set up ESXi 6.0 U2 vCenter Server with SQL 2012 Database.Management of Infra: VCEM,VCM, vCenter Server, Confidential SIM Ticketing System: Remedy, Unicenter Service Desk, Peregrine, Ionix Network Infrastructure: TCP/IP, DNS, DHCP, NATįile Transfer: FTP, SFTP - Open SSH, WinSCP Remote Monitoring: VNC, Terminal Service/RDP 5.0, Dame Ware, Confidential SIM Migration Tools: Plate Spin Migrate 9.0, VMware Converter 3.x/4.x/5.1, Good Understanding of how HA, DRS,DPM,NSX,EVC,vMotion and SvMotion technologies work
Virtualization: ESX 2.x/3.x/4.x/, ESXi 4.0/5.1/6.0 U2, Virtual Center 1.x/2.x/4.x/5.1/6.0U2, vSphere 4.0/5.1/6.0U2, Wintel/Linux P2V & V2V, Update Manager, Hyper - V, NSX, vROPS implementation, Have good knowledge and understanding of vRealize Suite and Horizon View.(VDI) Hardware: c7000 Enclosures, BL460c G7, G8 blades Over Eleven (11+) years of progressive, responsible and diversified experience as a VMware Virtualization Engineer supporting small to large businesses with IT infrastructure Consulting, Project Execution, Designing and Architecting, Business Continuity Planning for enterprise customers covering appropriate technology.